|
Past performance history has seen the company create a large stable client base some of which are listed below as well as examples of the work involved:
Underground Cabling
City of Tea Tree Gully
Modbury Regional Centre Undergrounding of Power
City of Salisbury
PLEC Scheme Bagsters Road, Salisbury North consisting of installation of 1200 metres of ETSA conduits, transformers and various junction and service pits
Northern Power Lights & Distribution - joint venture
City of Adelaide - directional boring parklands for lighting
ETSA Utiltities
Involves various projects within South Australia i.e. upgrade of sub-stations, junction and service pits, switching cubicles and transformer installations etc.
Telstra & Telstra NDC
directional boring on various projects i.e. Myponga, Snowtown, Pt Lincoln, various areas of the South East and local areas for pipe and pit installation
Skilled Communications
various projects within South Australia for Optus pipe and pit installations
OPTUS
various projects within South Australia for pipe and pit installations
Visionstream
various projects within South Australia for Telstra pipe and pit installations
Origin Energy (formerly Boral [formerly SAGASCO])
laying of various size gas pipes within South Australia i.e. Golden Grove Development area and Grand Junction Road 100mm steel main of some 500 metres
Adelaide City Council Interaction
installation of electrical conduit for the bicycle path along Anzac Highway between Richmond Road and the West Terrace Cemetery - directional boring method
installation of large display lights and conduit runs in various parklands around the CBD - directional boring method and trenching
installation of a large pollutant trap outside the University of South Australia on Victoria Drive
installation of OPTUS conduits and pits along Grenfell Road, South terrace, Waymouth, Grenfell and Charles Streets - directional boring method and trenching
installation of electrical conduits along Botanic Road and crossing under Botanic Road - directional boring method
Civil Construction and Streetscaping
City of Burnside
deep drainage work involving the installation of stormwater drainage at depths of up to 5 metres in a congested residential area during the winter months with considerations being made for resident liaison, traffic management and underground services
extensive streetscape programmes throughout the area
Glenside Detention Stormwater Basin
BHAS Pasminco Metals, Pt. Pirie
having established a sub-contract relationship with York Civil we quickly formed a mutually beneficial liaison with Sam Mezzini from BHAS. The project involved installation of large diameter concrete pipe for drainage in adverse ground conditions which included collapsing ground and ground water being present, other considerations being made for the presence of heavy machinery and daily operations with the smelters
City of ( Elizabeth ) Playford
construction of a stormwater system was undertaken with the inclusion of the excavation of 2 large retention basins within residential areas
extensive streetscape programmes throughout the area and headwall structures
City of Salisbury
construction of roundabouts and pedestrian crossing entailing relocation of underground services, drainage, road, kerb and gutter constructions and streetscaping with major consideration being given to traffic management
construction of drainage systems
construction of skate park facilities
Murfield Group
drainage construction carried out at the Patawalonga South Golf Links, some 10 km of PVC stormwater drainage up to 5 metres in depth in adverse ground conditions with extensive consideration being given to de-watering and shoring of excavations. Irrigation systems for the greens is also being undertaken
SA Water Corporation
Mypolonga Irrigation Rehabilitation surge tank overflow main.
District Council of East Torrens
streetscaping at Uraidla
Ecosol Pty Ltd
installation of Gross Pollutant Traps of various sizes
Fairmont Civil
CST Chelsea Gardens and Evanston Gardens
Alpine Constructions Pty Ltd
(Controlled fill site) Adelaide Central Mission (Controlled fill site) - 10 Independent Living Units at Felixstow - bulk excavation and imported fill
Marshall & Brougham
Regency Park Tafe - (Controlled fill site) bulk excavation and import fill
Specialised Construction & Management Pty Ltd
Pacific Marine Batteries - Osborne - bulk excavation and imported fill
Schenker International - Royal Park - civil works, stormwater, preparation and DOT Works
Whilst Tron has undertaken projects either as a main contractor or under a sub-contract agreement we have also entered into formal joint ventures which have enabled the company to further expand not only it's financial aspects but both machinery and human resources as well
|